Datacenter Info
From Dacentec
Revision as of 14:57, 12 June 2013 by DacentecJoshJ (Talk | contribs)
Dacentec has built a super high efficiency datacenter in Lenoir, North Carolina, USA
The datacenter is cooling using a combination of Liebert CRAH (Computer Room Air Handler) units using chilled water from a central chilled water plant as well as a unique air-side economizer that was designed and built by Dacentec.
This design allows us to operate at PUE (Power Usage Effectiveness) values of less than 1.2 when the conditions outside are appropriate.
25,000 SF hardened facility
SSAE16 SOC 2 Certification
Onsite US Based Sales and Support