Dacentec has built a super high efficiency datacenter in Lenoir, North Carolina, USA
 
Dacentec has built a super high efficiency datacenter in Lenoir, North Carolina, USA
 
  
 
The datacenter is cooling using a combination of Liebert CRAH (Computer Room Air Handler) units using chilled water from a central chilled water plant as well as a unique air-side economizer that was designed and built by Dacentec.
 
The datacenter is cooling using a combination of Liebert CRAH (Computer Room Air Handler) units using chilled water from a central chilled water plant as well as a unique air-side economizer that was designed and built by Dacentec.
  
 
This design allows us to operate at PUE (Power Usage Effectiveness) values of less than 1.2 when the conditions outside are appropriate.
 
This design allows us to operate at PUE (Power Usage Effectiveness) values of less than 1.2 when the conditions outside are appropriate.
 +
 +
25,000 SF hardened facility
 +
 +
SSAE16 SOC 2 Certification
 +
 +
Onsite US Based Sales and Support

Latest revision as of 21:25, 3 September 2016

Dacentec has built a super high efficiency datacenter in Lenoir, North Carolina, USA

The datacenter is cooling using a combination of Liebert CRAH (Computer Room Air Handler) units using chilled water from a central chilled water plant as well as a unique air-side economizer that was designed and built by Dacentec.

This design allows us to operate at PUE (Power Usage Effectiveness) values of less than 1.2 when the conditions outside are appropriate.

25,000 SF hardened facility

SSAE16 SOC 2 Certification

Onsite US Based Sales and Support